On a data center campus, much of the heaviest work sits in the mechanical package: chillers, cooling towers and the chilled water mains running out to the data halls. When that scope grows mid-project or the sub you planned on can’t staff it, you need a data center mechanical contractor with real crews behind the bid. At Process Equipment and Controls, our own crews install the process and chilled water piping, rig and set the major equipment, and build the pipe-support steel and platforms it all sits on.
We’ve worked on multiple fast-track data center campuses, and we bring the same piping and millwright discipline our crews use in manufacturing plants across the Southeast, where the equipment has to run every shift. With the campus work and the plant work behind us, our crews aren’t learning the trade on your job.

We run the process and chilled water piping from the central plant out to the cooling equipment in the data halls. On cooling systems that can be managed together, that includes the dual paths, isolation valves, and bypasses the design calls for.
Because our process piping crews install carbon steel, stainless, copper and plastic piping, we can usually work in whatever material each of your piping systems calls for. We pressure test the piping we install and support the flushing and cleaning your project specifies, so the loop goes into commissioning clean and tight.

Our industrial rigging crews take on the major cooling equipment on data center builds. We set each piece and pipe it ourselves.
Whether a chiller goes into the mechanical yard, onto roof steel or into the central plant, we set it on its pad or steel, ready for piping. When a campus calls for a row of matching chillers, we set them consistently so the headers and branch piping that follow go together cleanly.
On water-cooled plants, we rig and set the cooling towers, too. Some manufacturers tie a tower’s wind and seismic ratings to the support and anchor locations on their unit drawings, so we set towers to match.
Pumps round out the plant: we set the chilled water and condenser water pumps, along with the prefabricated pump skids many projects bring in. We fit the piping to meet each pump and skid without strain, so they stay in line.

We build the pipe-support steel and equipment platforms as part of the mechanical scope:
Because we build the platform and set the equipment on it, support points and elevations get settled inside one team instead of between two subs. Structural steel beyond the mechanical scope is a separate service we offer as data center structural steel.
You can contract the mechanical scope by itself, and we’ll carry it as a focused package. That’s often the right fit when the rest of the build is already bought out and mechanical is the gap. Send us the mechanical drawings, and we’ll be straight with you about what we’d take on.
When it helps to have more of the build in one place, our data center construction services also take in electrical, structural steel and interiors. Each trade you add to our package is one less contract to manage and one less handoff on site. On the cooling plant, that puts the mechanical and electrical work at each chiller and pump on one schedule, under one safety program.
A few project variables usually shape the mechanical work we carry on a campus:

When GCs compare data center mechanical contractors, the questions are usually the same: have you worked at data center scale, and can you staff it? Our projects include Phase 1 of a data center campus planned for 300MW, where we have sent over 100 people.
As for staffing, we have a 150-person crew and contract partners. We’re based in Covington, Georgia, and work across the Southeast, though our data center work has taken us well beyond it. We also manage safety in-house, because safety means more than compliance to us; it’s our covenant with you. Learn more about our data center projects.
Whether you need crews for the whole cooling plant or help with a mechanical package that’s outgrown its sub, tell us about the project and your schedule, and we’ll talk through how the work fits it. We’re glad to start with a free specification call or quote, with no obligation. Call (770) 487-1413 or reach out below.
Diverse Industries, One Trusted Partner
Safety means more than compliance; it’s our covenant with you.







Whether you’re coordinating your next project or proactively planning your plant maintenance, there’s no better time than right now to contact us.